Dunn Avenue/Main Street Corridor
Revitalization Plan, City of Jacksonville Planning and
Development Department
TPG will analyze the various roadway links
and intersections to determine traffic operating conditions
within the Corridor and identify improvements that may be
required to assist corridor revitalization. TPG collected the
data required to conduct the corridor analysis as well as
develop road improvement cost estimates and any additional right
of way needs.
Volusia County MPO 2025 Long Range
Transportation Plan Volusia County MPO
Responsible for the implementation of the
public involvement activities associated with the Long Range
Transportation Plan (LRTP) development. Serves as a facilitator
for the “Strings and Ribbons Games’ whereby citizen work groups
participating in the advertised LRTP public workshops identifies
the list of transportation improvements they want to see
included in the LRTP’s Cost Feasible Plan. TPG will prepare the
technical memorandum required to document the public involvement
process.
Roosevelt Blvd/Timuquana Rd.
Intersection Study, JTA
Collected two-day turning movement counts
and four-day vehicle classification counts. Analyzed the seven
initial alternatives to determine their operating conditions
during each of the horizon years.
Caron Drive Extension and Dean
Road Traffic Studies, City of Jacksonville.
Analyze area development and socio-economic
data to forecast future traffic volumes and transportation
improvements required in the Dean Road and Caron Drive
Corridors.
Volusia County MPO 2005 Long Range
Transportation Plan,
Assisted with the implementation of the
public involvement activities associated with the development of
the long range transportation plan.
Consolidated Dpwntown Jacksonville
DRI Traffic Monitoring Report,
Conducted quality review and assessment
analyses. |